ISO 31000 Risk Management in Practice: Adoption Challenges and Benefits in Qatar’s Leading Construction Firm

Article Details

Alex P. Ocampo; ; Cebu Institute of Technology-University, Cebu City, Philippines
Gerelyn S. Dela Cruz; gerelyn.delacruz@cit.edu; Center of Advanced Studies, Cebu Institute of Technology-University, Cebu City, 6000, Philippines

Journal: International Journal of Multidisciplinary: Applied Business and Education Research
Volume 6 Issue 8 (Published: 2025-08-01)

Abstract

The construction industry frequently faces a range of risks, including safety concerns, financial uncertainty, and operational interruptions that can result in substantial costs. Given these ongoing challenges, adopting a structured approach to risk management has become increasingly important. This study examines the application of the ISO 31000 risk management framework in practice at XYZ Construction in Qatar, with a particular focus on the challenges encountered during implementation and the benefits observed by employees. Data were collected through a structured survey using a convenience sampling method, involving 56 employees from different levels of the organization, to evaluate the effectiveness of the applied risk management practices. The top five benefits identified were enterprise-wide risk perspective, alignment with organizational goals, proactive approach to risk, cost reductions, and increased stakeholder confidence. Nonetheless, implementation faced several barriers, such as knowledge and skills gaps, cultural and operational integration difficulties, limited training and leadership involvement, resistance to change, and inadequate resource allocation. This study utilized multiple regression analysis to investigate the simultaneous influence of various factors on the adoption of ISO 31000. Despite the comprehensive assessment of multiple variables, the findings indicated no statistically significant effect, implying that additional determinants may affect the adoption process. The findings highlight leadership support, clear communication, and strategic planning as vital for embedding risk management. Recommendations focus on targeted training, stronger leadership involvement, tailored risk tools, and improved cross-departmental collaboration to enhance resource allocation, cultural integration, and overall risk management effectiveness.

Keywords: ISO 31000; Risk management; Construction industry; Capacity-building; Qatar; Challenges; Enterprise risk management

DOI: 10.11594/ijmaber.06.08.33
  References:

Contract Management System among Selected Construction Companies in Qatar

Alaa Hussein, H., & Kamel Jawad, M. (2024). Evaluation of risk management in the ministry interior of iraq according to the standards (ISO 31000: 2018). Journal of Economics and Administrative Sciences, 30(142), 69–85. https://doi.org/10.33095/e21b7x84

Albasyouni, W., Kamara, J., & Heidrich, O. (2025). Key challenges and opportunities to improve risk assessments in the construction industry. Buildings, 15(11), 1832. https://doi.org/10.3390/buildings15111832

Al-Khazaleh, S., Badwan, N., Qubbaj, I., & Almashaqbeh, M. (2025). Level of financial disclosures for listed insurance companies using ISO 31000: Empirical evidence from Jordan and Palestine. Asian Review of Accounting, 33(2), 386–407. https://doi.org/10.1108/ARA-05-2024-0151

Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In Risk Management—Current Issues and Challenges. IntechOpen. https://doi.org/10.5772/51460

Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99–120. https://doi.org/10.1177/014920639101700108

Becker, G. S. (1993). Human Capital: A Theoretical and Empirical Analysis, with Special Reference to Education (3rd ed.). University of Chicago Press.

Berends, T., Stewart, R., Cretu, O. (2011). Risk Management for Design and Construction. John Wiley & Sons, Inc.

British Standards Institution. (2011). Risk management – Code of practice and guidance for the implementation of BS ISO 31000 (BS 31100:2011). British Standards Institution.

Chenya, L., Aminudin, E., Mohd, S., & Yap, L. S. (2022). Intelligent risk management in construction projects: Systematic literature review. IEEE Access, 10, 72936–72954. https://doi.org/10.1109/ACCESS.2022.3189157

Connair, S. (2013). Enterprise risk management: From silos to strategic objectives. Armed Forces Comptroller, 24-26.

COSO. (2004). Enterprise Risk Management - Integrated Framework. Committee of Sponsoring Organizations of the Treadway Commission.

Cronbach, L. J. (1951). Coefficient Alpha and the Internal Structure of Tests. Psychometrika, 16, 297-334. https://doi.org/10.1007/BF02310555

Elbashbishy, T. S., Hosny, O. A., Waly, A. F., & Dorra, E. M. (2022). Assessing the impact of construction risks on cost overruns: A risk path simulation–driven approach. Journal of Management in Engineering, 38(6), 04022058. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001090

Fraser, J., Quail, R., & Simkins, B. (2021). Enterprise Risk Management: Today’s Leading Research and Best Practices for Tomorrow’s Executives (2nd ed.). Wiley.

Fraser, J., & Simkins, B. (2016). The challenges of and solutions for implementing enterprise risk management. Business Horizons, 59(6), 689–698. https://doi.org/10.1016/j.bushor.2016.06.007

Gleißner, W., & Berger, T. B. (2024). Enterprise risk management: Improving embedded risk management and risk governance. Risks, 12(12), 196. https://doi.org/10.3390/risks12120196

GWC secures ISO 31000:2018 recertification. (2025, March 20). The Peninsula. https://thepeninsulaqatar.com/article/20/03/2025/gwc-secures-iso-310002018-recertification?utm_source=chatgpt.com

Hardjomidjojo, H., Pranata, C., & Baigorria, G. (2022). Rapid assessment model on risk management based on ISO 31000:2018. IOP Conference Series: Earth and Environmental Science, 1063(1), 012043. https://doi.org/10.1088/1755-1315/1063/1/012043

Hopkin, P. (2018). Fundamentals of Risk Management: Understanding, Evaluating and Implementing Effective Risk Management (Fifth). Kogan Page.

Hutchins, G. (2018). ISO 31000:2018 Enterprise Risk Management.

ISO. (2018). ISO 31000:2018 – Risk management – Guidelines. International Organization for Standardization.

ISO 31000:2009 Certificate Award for QPM. (2019, August 27). Qatar Project Management Company (QPM). https://www.qpm.com.qa/english/MediaCenter/News/Pages/Press28082019.aspx?utm_source=chatgpt.com

ISO 31000 Certification in Qatar. TopCertifier. Retrieved April 3, 2025, from https://www.iso-certification-qatar.com/iso-31000-certification.html?utm_source=chatgpt.com

Kendrick, T. (2015). Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project (Third). American Management Association.

Kerstin, D., Simone, O., Nicole, Z., & Lehner, O. (2014). Challenges in implementing enterprise risk management. ACRN Journal of Finance and Risk Perspectives, 3(3), 1-14.

Kotter, J. P. (1996). Leading change. Boston, MA: Harvard Business School Press.

Leitch, M. (2010). Iso 31000:2009—The new international standard on risk management. Risk Analysis, 30(6), 887–892. https://doi.org/10.1111/j.1539-6924.2010.01397.x

Lewin, K. (1951). Field theory in social science: Selected theoretical papers (D. Cartwright, Ed.). New York: Harper & Brothers.

Leyronnas, K. (2022, January 3). Better compliance with risk framework ISO 31000? Here’s how. Zenya Software Blog. https://zenya-software.com/en/knowledge/iso-31000/

Msheireb Properties awarded the international ISO 31000:2009 Risk Management Standard. (2013, March 16). BSI Group. https://www.bsigroup.com/en-AE/About-BSI/Media-Center/Press-releases/2014/March/Msheireb-Properties-awarded-the-international-ISO-310002009-Risk-Management-Standard/?utm_source=chatgpt.com

Moeller, R. R. (2011). COSO Enterprise Risk Management: Establishing Effective Governance, Risk, and Compliance Processes. (2nd ed.). Wiley.

Okika, M. C., Vermeulen, A., & Pretorius, J. H. C. (2025). A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), 42–66. https://doi.org/10.1108/JFMPC-09-2023-0057

Ökmen, Ö., Leijten, M., Stratton, T., Bosch-Rekveldt, M., & Bakker, H. (2024). Employee perspectives on risk management in a construction company. Journal of Risk Research, 27(3), 404–422. https://doi.org/10.1080/13669877.2024.2328202

Pagach, D. P., & Warr, R. S. (2011). The characteristics of firms that hire chief risk officers. Journal of Risk and Insurance, 78(1), 185-211.

PMI. (2013). A guide to the project management body of knowledge (PMBOK® Guide) (5th ed.). Project Management Institute.

PMI. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.

Purwanti, L., Triyuwono, I., Maski, G., Pusposari, D., Prakoso, A., & Ibrahim, M. (2025). The impact of ISO 31000 adoption on the performance of banking companies in Indonesia. Cogent Business & Management, 12(1), 2507222. https://doi.org/10.1080/23311975.2025.2507222

Putri, N. L., & Wijaya, A. F. (2023). Information technology risk management in educational institutions using iso 31000 framework. Journal of Information Systems and Informatics, 5(2), 630–649. https://doi.org/10.51519/journalisi.v5i2.468

Qatar Charity obtains 5 ISO certificates. (2024, January 2). Qatar Charity. https://www.qcharity.org/en/qa/news/details/22827-qatar-charity-obtains-5-iso

Renault, B., Agumba, J. N., & Balogun, O. A. (2016). Drivers for and obstacles to enterprise risk management in construction firms: a literature review. Procedia Engineering, 164, 402-408. doi: 10.1016/j.proeng.2016.11.637

Schein, E. H. (Ed.). (2010). Organizational culture and leadership (4th ed). Jossey-Bass.

Sharma, S. & Gupta, A. K. (2019). Risk identification and management in construction projects: literature review. International Journal of Humanities, Arts and Social Sciences, 5(6), 224-231. https://dx.doi.org/10.20469/ijhss.5.20002-6

Smiechewicz, W. (2001). Case study: implementing enterprise risk management. Bank Accounting & Finance, 14(4):21-27.

Sousa, V., Almeida, N., & Dias, L. (2012). Risk management framework for the construction industry according to the iso 31000:2009 standard. Journal of Risk Analysis and Crisis Response, 2(4), 261-274.

Soubra, L., Al-Mohannadi, A., Berzan, Y., Consunji, R., El Menyar, A., Al Thani, H., Al-Marri, M. A., & Al-Hajri, H. S. (2025). Impact of risk mitigation strategies on non-fatal injuries in the construction sector in Qatar: A retrospective analysis. International Archives of Occupational and Environmental Health. https://doi.org/10.1007/s00420-025-02126-x

Truslow, D. K. (2003). Operational Risk Management: It’s Everyone’s Job. The RMA Journal, 85(5):34-37.

Yousri, E., Sayed, A. E. B., Farag, M. A. M., & Abdelalim, A. M. (2023). Risk identification of building construction projects in Egypt. Buildings, 13(4), 1084. https://doi.org/10.3390/buildings13041084

  Cited by:
     None...